(Rpt_125) Availability - Physical
Shows the physical availability for the designated period of time. The downtime used in the calculation is dependant on the "responsibility" nominated by the user.
To Trend, "Analyse By" Month. To compare equipment with fleets, analyse by equipment and fleet.
Tips
Physical Availability = (Scheduled Hours - Downtime) / Scheduled Hours.
Scheduled Hours are defined using the Scheduled Hours function, and typically represent the calendar hours of a month.
|ControlType|, |IDlist|, |TextList|, |ProjectionTypes|, |UserID|,
|AutoLaunch|,|BranchID|,|SiteID|,|FleetID|,|EqpPlanID|,|Branch|,|Site|,
|Fleet|,|EqpPlan|,|DateChecked|,|StartDate|,|EndDate|,|AnalyseBy|, |Responsibility|,
|ResponsibilityID|
Report parameters
Default.
Additional filters
Responsibility, System, Task Type, Maint. Order Type, Planned, Planning Group, Breakdown,