To configure enterprise data imported into XECUTE, click the Data Feed In icon.
Data Feed In allows for the configuration of data that will be consumed by XECUTE from RPM Enterprise Planning Framework (EPF). Examples include schedule guidance, drill hole data, fleet management system GPS data and stockpile inventories.
XECUTE checks the Data Feed In every minute. If there is a problem or issue (incorrect datasource or definitions and so on), the retry mechanism changes to once every five minutes, second retry is every 30 minutes then every six hours (if it works in a retry, it goes back to one minute refresh interval).
After the Data Feed In has been configured, a panel to the right will preview the latest matching dataset that exists in EPF.
The image below shows a Data Feed In configuration panel for Schedule Guidance.
The image below shows the preview panel with Last Retrieval Result messages and the preview grid. The preview columns can be sorted and filtered by clicking in the column header cells. The Last Retrieval Result panel shows the date the data was retrieved and any associated error messages pertaining to the dataset.
Map the relevant dataset definition field (in the drop-down lists) to each XECUTE Mappings field. Any unassigned dataset fields are listed in the Additional Attributes section. The dataset definition field data type will be validated against the XECUTE mappings field data type.
# - Mandatory fields
^ - applicable to Staged Stockpile nodes
Geometry - The spatial data of a data feed can be represented as OGC compliant Well Known Text (WKT) which is an ASCII format, Serialized Spatial Data (data published from other RPM products) or by individual fields to hold the coordinate values, for example drill hole or machine positions. If Well Known Text is selected, a single text field is available to hold the ASCII data.
Data Type | Mappings |
---|---|
Bucket Positions |
Loader bucket position data used to trim the activity areas.
|
Drill Hole - Actual |
Drill hole data from a fleet management system for display in XECUTE. Spatial data supports linestrings.
|
Drill Hole - Plan |
Drill hole data from a planning system for display in XECUTE. Spatial data supports linestrings.
|
Dump Reconciliation |
Inventory checkpoint data to set material flow stockpile and dump initial values.
|
LIFO Stockpile Reconciliation |
Inventory checkpoint data to set material flow LIFO parcel initial values. Stockpiles can be regular 'averaged' type stockpiles or staged stockpiles with one or more piles.
|
Maintenance Order |
Maintenance orders from ERP systems.
|
Resource Position |
Fleet Management System tracking data to show resource positions in the 3D Scene.
|
Schedule Guidance |
Activity area spatial data and attributes from external planning systems.
The EPF Dataset Definition that holds the schedule guidance data has specific requirements. The Identifier, Start Date and Elevation fields must be keys in the Dataset Definition. If the guidance data is from an external source, the geometry data must be in OGC-compliant WKT format and a key data type. If the guidance data is from RPMGlobal Solutions, the geometry is serialised spatial data. |
Stockpile Reconciliation |
Inventory checkpoint data to set material flow stockpile initial values. Stockpiles can be regular 'averaged' type stockpiles or staged stockpiles with one or more piles.
|