On the Production Details window, the Resource Hours parameters are available when the resource type is set to either:
• | AutoScheduler and Production Rate; or |
• | AutoScheduler and Target. |
Refer to the AutoScheduler User Guide for information on these options.
• | Lower Limit |
• | Delay Activity |
• | Maximum Increase in Production Rate. |