The window displays when you run a schedule or generate a Schedule Status plot. If required, you can change the default settings before proceeding.
1. | Change the (XPAC displays only the available start and finish periods specified in the active calendar database for the active scenario): |
a. | Select the to determine the starting point from which XPAC runs the schedule. |
b. | Select the to determine the end point at which XPAC stops running the schedule. |
a. | Change the to determine the point in the schedule at which to start recalculating. (You can specify a default value for this field. See ?Changing the scenario start point for more information); or |
b. | Select the check box if you want the schedule to always start from the beginning. |
3. | If available, generate a in addition the schedule: |
a. | Click the check box. The drop-down list becomes available for selection. |
b. | Select a Schedule Status plot that you previously created. |
c. | Select a period from the drop-down list. |
4. | If required, deselect the check box. |
5. | If available, select the check box for each report that you want to generate after XPAC has run the schedule. Otherwise, select the check box to run all reports. |
XPAC either:
• | runs the schedule for the active scenario; or |
• | generates the spatial data plot. |