On the Production Details window, the Step Size parameters are available when the resource type is set to either:
| • | AutoScheduler and Production Rate; or |
| • | AutoScheduler and Target |

Refer to the AutoScheduler User Guide for information on these options.
| • | Requested Step Size |
| • | Continue Step over Period Boundary |
| • | Reserve Step. |