On the Production Details window, the Step Size parameters are available when the resource type is set to either:
• | AutoScheduler and Production Rate; or |
• | AutoScheduler and Target |
Refer to the AutoScheduler User Guide for information on these options.
• | Requested Step Size |
• | Continue Step over Period Boundary |
• | Reserve Step. |